91¸£ÀûÉç

Apply for a Building Warrant

You must  via the eBuilding Standards website. If you are already registered with ePlanning, use the same login details.  are available to download from the website.

Read the . For larger and more complex projects you can request pre-application advice.

You may also need planning permission.

Process for submitting a Building Warrant

 which provides guidance for agents on how to prepare drawings and supporting information before presenting them as part of an application for Building Warrant.

Submitting information in this way will help to 

  • speed up the process 
  • get your application granted
  • reduce the assessment time for your application.

Use the examples in the methodology to guide you as you create your drawings and specifications.

There are 2 areas of the guidance which will significantly help the assessing surveyor. Please ensure

  1. You use the Additional Supporting Documents form when submitting revised/additional information and quote the correct council reference number. For exaxmple,  24/12345/WARR.
  2. Drawing revisions must be either numbers or letters only. For example, do not combine numbers and letters together (such as  Revision A/1).

Failure to adhere to all the published guidance will result in a delay to your application.

Staged applications

In some circumstances, a building’s design cannot be fully completed where the building is large or complex. This may be

  • a result of specialist sub-contractors design
  • a provision of certificate of design schemes (SER)
  • the building occupancy may not yet be fully determined.

To allow for progress of the Building Warrant application and for construction to begin on site, consideration may be given to splitting the application into stages. These stages must be agreed with the verifier before the submission being made, with such agreements being discussed as part of the .

For new build housing applications, building warrants may typically form 2 stages

  • Substructure
  • All other works

For more complex applications, an example of the staging split may be

  • enabling works
  • substructure, including drainage
  • superstructure
  • general arrangements, including fire strategy where applicable
  • building envelope
  • building services, for example MEP, HVAC etc.

Certificate of Design – SER

Further to the changes to the SER in 2017, many schedule 1 items which includes designs for specialist sub-contractors, cannot be included under the Certificate of Design’s Form Q. Therefore, consideration should be given to the use of specialist sub-contractors and where a design element may need to be isolated within a separate building warrant application stage.

Fire engineering

Where a building design includes a fire engineered approach, please note that this will only be considered as supporting information forming part of the general arrangements stage.

To allow for early discussion and engagement on any alternative approach to design, which may include fire engineering, we would identify this as a key issue for discussion as part of our .

Alternative method of compliance

This form should be used when your proposed design does not follow the guidance within the technical handbooks. You should explain clearly and concisely why your proposal should be accepted as an alternative to the guidance given in the technical handbooks.

Request an alternative method of compliance

Please email the completed form to the surveyor who is processing your application.

Building Warrant payments and fees

You can at the same time as submitting your application via the eBuilding Standards website

Alternatively, you can make a payment after you have applied or where the original fee was either incorrect or has been challenged.

We no longer accept cheques or phone payments for Building Warrant applications.

Please note that the proposed value of works will be checked by our surveyor against the RICS building cost information surveys of tender prices. This records the cost / m2 to build different types of buildings in different areas of the country. You will be notified if the value of works have been underestimated and if an extra fee is required.

Download Building Warrant fees - PDF

Download cost of works - PDF

Waverley Court

Building Warrant cheques

We no longer accept cheques for Building Warrants.